Call Us : +919653349593
info@reynainfraprojects.com
Change Language
Pre Engineered Building

Pre Engineered Building

62.00 - 65.00 INR/Kilograms

Product Details:

  • Material Steel
  • Roof Material Steel
  • Color white
  • Use Warehouse Kiosk House
  • Click to view more
X

Pre Engineered Building Price

  • 5000 Kilograms
  • 62.00 - 65.00 INR/Kilograms

Pre Engineered Building Specification

  • Steel
  • white
  • Steel
  • Warehouse Kiosk House

Pre Engineered Building Trade Information

  • 5000 Kilograms Per Day
  • 2 Days
  • Yes
  • Free samples are available
  • All India

Product Description

Backed by experience of years in this field, we have successfully been engaged in manufacturing and supplying the best quality Pre Engineered Building. This building is fabricated using supreme grade steel and other raw materials with the help of advanced machinery. The provided building is used in residential and commercial premises. Furthermore, we offer this product to our valuable patrons at reasonable rates. They are known for their weather proof nature, impeccable finish, extended durability and needs less maintenance.

Pre Engineered Building Specifications:


1. Built Type: Prefab

2. Feature: Glass, Eco Friendly, Easily Assembled

3. Usage: Toilet, House, Shop, Kiosk

4. Height: 35 meters to 95 Meters

FAQs of Pre Engineered Building:


1. How long does a PEB building last?


Ans - Depending on how well the building is used, a solid framework made of high-quality materials can easily last for anywhere between 25 and 50 years. 

2. How can pre-engineered construction be economical?


Ans - Pre-engineered buildings demand less time and labour during production. This kind of construction is more expedient, inexpensive, and economical. On the other hand, a significant amount of labour and time were needed to construct the RCC. Thus, it is the expensive process. 

3. Where is PEB applicable?


Ans - School buildings, auditoriums, theatres, and exhibition halls can all be built using PEBs. These days, PEBs are being utilised in hospital building. In addition, PEBs can be utilised to build greenhouses, grain storage facilities, poultry farms, dairy farms, and animal shelters. 

4. Which construction method is superior, RCC or PEB?


Ans - RCCs have an advantage here since they are highly fire-resistant without compromising their structural characteristics. Unless specifically treated and changed, PEBs are less fire-resistant. High wind speeds and flying debris can both tolerate RCC structures. PEBs are wind resistant too but not as much as RCCs.
Enter Buying Requirement Details
Email Id
Mobile number

Other Products in 'Prefabricated Building' category



"We are only dealing in Goa, Gujarat, Karnataka, Maharashtra, Madhya Pradesh, Rajasthan."
Back to top